Executed for DB Schenker & Ford Logistics,
Location – Dubai Industrial Area, United Arab Emirates
The Atlantic Warehouse Project in Dubai was a landmark industrial development, executed for DB Schenker & Ford Logistics, under the leadership of our client, Mr. S. Chandrasekaran.
The warehouse was designed to meet international standards for storage, logistics, and operations — tailored specifically to the needs of large-scale automotive and supply chain functions.

High-standard warehouse project to life.
Our team’s adaptability, helped us overcome all challenges and deliver a result that met both client expectations and Dubai’s industrial requirements.
Design Highlights
- Modern façade with a clean, functional elevation
- Large loading bays with high-clearance dock entries
- Optimized for ventilation and temperature stability
- Durable and weather-resistant exterior materials
- Efficient internal zoning for storage, logistics, and dispatch


Challenges Faced
- This project tested our team’s engineering resilience and on-site problem-solving abilities.
During execution, Dubai experienced unprecedented heavy rains, leading to water-logging and construction delays.
Despite these setbacks, our team redesigned work schedules, optimized material movement, and coordinated closely with on-ground teams to deliver the project without compromising on quality.